tag
tag
Back
Our History
Our Smart Factory
Our Marketing Strategy
Our Quality Assurance
EN
  • EN
  • 繁
  • 简
tag tag
  • About Us

    Our History
    Our Smart Factory
    Our Marketing Strategy
    Our Quality Assurance
  • Our Service

    What We Offer
    Product design Consultation
    Turnkey Solution
    Our Specialized Products
  • Product
  • News
  • Contact Us
  • EN
    tag
    繁
    tag
    简
    tag
tag tag tag
Home
 / About Us
 / Quality Assurance
Quality Assurance
tag
Quality Assurance
tag
ENSURES OUR STRONG QUALITY CONTROL

•       Heng Yu focuses on continuous process improvement to deliver highest achievable quality in a most cost-effective way. ISO-13458, ISO-9001:2008 and ISO-14000 certified manufacturing facility ensures our strong quality  assurance system is properly maintained. Quality initiatives are keys to our success and are integral parts of our every phase of process starting from design and development until shipment and after-sales services. 

•       Heng Yu can devise a customized quality inspection and testing plan for our customer based on the functionalities and complexity of the products. Heng Yu can also help customers to apply for all necessary testing approvals for the products at our local authorized testing laboratories. 

•       Heng Yu also has many in-house test and compliance equipment to maintain and assure our highest possible quality of our products. These testing equipment include life cycle test machines, abrasion test machine, electrostatic discharge gun, cable twist testing machine, temperature and humidity chamber, and burn-in chamber. 

•       All Heng Yu products will have 100% in-line routine functional testing and visual inspection. Heng Yu will also perform out of box audit on every shipment. All products under Display Devices and Terminals category have to further pass a burn-in test inside our burning room of 45 Degree Celsius.

•       Our Smart Production System allows each workstation to reflect the instant quality status to the system and then generate instant alerts to the production management when the quality problem exerts a certain threshold.

•       Our Smart Production System will download all the updated documents to each smart production cell before the assembly starts. First Article Inspection is requested and well documented before the assembly can continue to finish the production.

•       Our Smart IQC System enables quality inspectors to follow all the instructions to test and inspect all the incoming materials. The system will also show up the quality problems happened in the past so as to remind the inspectors of some critical inspection area.

 

tag
tag
Product Development Cycle

 

•       Kick off the detailed design

•       Enter the first EVT

•       … until the prototypes confirmed

•       Enter the first DVT

•       … kick off the tooling production

•       … product finalization

•       … carry out testing plan

•       … verify the testing result

•       … do the risk analysis

•       … inspect all the FAI reports

•       … conduct the DFMEA (on request)

•       … until the final tooling sample is confirmed

•       Enter the first PVT

•       … plan for the pilot run

•       … prepare all the testing and production fixtures

•       … plan for the assembly flow

•       … conduct all the reliability test

•       … conduct the PFMEA (on request)

•       … until the pilot run units are confirmed

•       Enter the first MVT

 

tag
tag
tag
852-2394 1852
tag
hy_sales@hengyu-tech.com
About Us
Our Service
Product
Contact Us
tag
© 2023 Heng Yu Technology (HK) Limited. All Rights Reserved.
EN
繁
簡